Compliance Support for OEM Pump Projects

Micro Pump Certifications and Quality Control

JSG DC PUMP provides model-specific compliance documentation and quality-control support for miniature air, vacuum, liquid and piston pump projects. Certification scope depends on the selected pump model, motor, voltage, materials and final configuration.

Certification Documents Must Match the Approved Configuration

CE and RoHS documentation is available for many JSG micro pump models and configurations. Before a document is supplied, we confirm the exact model and the version intended for the OEM equipment.

Model-specific scope

The covered model, motor type, voltage and construction must match the product being evaluated.

Market and standard review

Tell us the destination market and requested standard so the applicable document set can be checked.

Project documentation

Full files can be supplied after the pump configuration and project requirement are confirmed.

DOCUMENT PREVIEW

Selected JSG27 CE and RoHS Documentation

The blurred documents shown here relate to selected JSG27 micro pump models. They demonstrate the type of compliance documentation available, but they should not be interpreted as covering every JSG pump or every customized version.

Contact us with the required model, configuration and target market to receive the applicable unblurred documentation for technical or purchasing review.

Request the correct files for your model →

CE and RoHS documents for selected JSG27 micro pump models
Blurred preview of 2025 CE and RoHS documents for selected JSG27 models. Full applicable documents are available upon request.

Typical Quality-Control Flow for an OEM Pump Project

The inspection plan is defined according to the product and order requirement. A typical project may include the following stages.

Requirement Review

Confirm medium, working point, voltage, control, duty cycle, noise target and environment.

Material and Parts Check

Verify specified components, wetted materials, wiring, connectors and key incoming parts.

Assembly Control

Monitor the approved assembly method and the product-specific in-process checkpoints.

Performance Validation

Check flow, pressure or vacuum against the agreed test condition and acceptance criteria.

Final Inspection

Confirm appearance, wiring, labeling, packaging and required shipment records.

Performance and Production Evidence

Working-point data and test conditions are more useful than unsupported headline values. The exact checks depend on the selected pump and its OEM application.

Information Required for Compliance and Validation Review

Send the items below so we can identify the correct pump documents and testing route.

Pump identification Exact model, motor type, voltage, control method and any customized parts.
Application Equipment type, medium, working flow and pressure or vacuum, and duty cycle.
Destination market Country or region where the final equipment will be sold or evaluated.
Requested documents CE, RoHS, material declarations, test records, drawings or other project-specific files.
Project stage Initial selection, sample validation, certification preparation or mass-production approval.

Frequently Asked Questions

Are all JSG pumps covered by one certificate?

No. Certification scope varies by model and configuration. The exact pump version must be confirmed first.

Can full certificates be supplied?

Applicable files can be provided for project review after the model, configuration and required market are confirmed.

Can JSG verify a required working point?

Yes, the proposed pump can be reviewed or tested against an agreed flow, pressure or vacuum condition.

Does certification cover the complete customer device?

No. Pump documentation does not replace the compliance assessment required for the customer’s complete equipment.

Request Documentation for Your Pump Configuration

Send the pump model, voltage, motor, medium, target market, required standard and estimated quantity. We will check the applicable documents and identify any additional validation needed.

Send Project Requirements